Every part traceable, every cost in place

Serial and batch traceability, subcontracting, quality inspections and actual cost for automotive suppliers; on one record, across all your plants.

Door panels and car bodies on an automotive production line
Industry problems

A supplier’s daily pains, lasting answers

We move what audits, recalls and cost reviews ask for onto one record.

The scope of a recall can’t be found

When a faulty batch surfaces, finding which shipment took it to which customer takes days; the cost grows with the scope.

With Hadron

Batch genealogy runs from the raw material consumed to the batch produced, and on to the shipment item and the customer. From a faulty batch you reach both the supplier and the customer in one chain.

Serial numbers live in a spreadsheet

Safety parts must be tracked one by one; a separate list does not stand up in an audit.

With Hadron

For serial-managed materials, goods receipt, production confirmation and shipment require as many serial numbers as the quantity. Each serial number’s passport shows all its movements from supplier to customer.

Plating and heat-treatment subcontracting is invisible

Galvanising, painting and heat treatment are done outside; material at the subcontractor and the subcontracting cost slip out of sight.

With Hadron

The subcontracted step is defined in the routing and its purchase order opens automatically. Material at the subcontractor is tracked separately, the cost flows to the production order, and scrap is reported from sent and returned quantities.

Quality records are scattered

Incoming inspection sits in one sheet, line inspection somewhere else; supplier performance is estimated at year end.

With Hadron

Inspection lots open automatically at goods receipt, production confirmation and shipment. At receipt, the quantity to be inspected waits in quality stock and is released, rejected or scrapped by decision. The supplier quality score is calculated from inspection results.

Part cost is an estimate

Standard cost was calculated years ago; its variance from actual cost is not visible even at month end.

With Hadron

Every production order adds up material, activity, subcontracting and overhead. The variance against standard cost is reported per order and posted to accounting in the same transaction when the order closes.

Value chain

From supply to shipment, on one record

Each stage inherits the batch, serial number and cost of the one before.

  1. 01

    Supply

    Material arrives with batch and serial numbers; incoming inspection opens automatically.

  2. 02

    Production

    Pressing, machining and assembly; confirmations post consumption, batch and serial.

  3. 03

    Subcontracting

    Plating, painting, heat treatment; material is tracked at the subcontractor, cost flows to the order.

  4. 04

    Quality

    Line and shipment inspections; every decision is recorded and feeds the supplier score.

  5. 05

    Shipment

    SSCC-barcoded cartons and pallets; e-waybill and e-invoice documents are generated.

Roadmap

What’s next for automotive

These capabilities are not in the product today; they are planned. Our customers’ needs set the order and timing — let’s talk in a demo.

Planned

Customer call-offs and EDI

Receiving delivery schedules (DELFOR, DELJIT) directly, with call-offs flowing into orders and planning automatically.

Planned

Kanban and backflushing

Repetitive production without orders on series lines; components consumed automatically at confirmation.

Planned

Measurement-based quality

Characteristics and measured values, SPC, control plans, PPAP files and certificates of analysis.

Planned

Tool and fixture management

Assigning tools to operations, stroke counters and counter-based maintenance alerts.

Planned

Shifts and OEE

Shift calendars per work centre; capacity and scheduling by shift, and OEE as a single percentage.

FAQ

What automotive suppliers ask

The most frequent questions before a demo.

Batch genealogy runs from the batch produced to the raw material batches consumed, and from shipment items to the customer. Open the faulty batch and you see, in one chain, which shipment took it to which customer and which supplier batch it was made from.

For serial-managed materials, yes: goods receipt, production confirmation and shipment require as many serial numbers as the quantity; too few or too many are not accepted. Entering a serial number for a material that is not serial-managed is rejected as well.

Yes. Material sent to a subcontractor is tracked separately in stock under that subcontractor and is consumed when the product comes back. The scrap report compares sent and returned quantities, and the subcontracting cost is written to the production order.

Not yet. Today customer call-offs are entered as sales orders and MRP plans from them. Receiving delivery schedules via EDI is on our roadmap; our customers’ needs set its order.

We measure the components of OEE: unplanned downtime per work centre, planned and actual operation time, and produced and scrapped quantity. A single OEE percentage needs availability calculated against a shift calendar; shift planning is on our roadmap. Until then we don’t produce a percentage, because it would be a guess.

Yes. Every production order adds up material, activity, subcontracting and overhead. The cost variance report shows standard and actual cost per order with the amount and percentage variance; when the order closes, the variance is posted to accounting in the same transaction.

See Hadron with
your own data

In a 30-minute demo, we set up your processes on Hadron together.