Every roll, every batch traceable from yarn to garment

Run your spinning, weaving, dyeing and apparel plants in different cities on one record; know where each roll was made and where it went.

Fabric roll winding machine in a textile mill
Industry problems

Textile’s familiar pains, lasting answers

We move what gets lost in spreadsheets, phone calls and the warehouse onto one record.

Size × colour, hundreds of item cards

Every size and colour is a separate stock item; creating them by hand takes days and mistakes are inevitable.

With Hadron

Variant matrix: pick the size and colour values and every combination is created in one step. Variants inherit the parent product’s bill of materials.

Rolls and batches can’t be traced

When a customer complains, finding which batch and which production run a roll came from takes hours.

With Hadron

Each roll is a barcoded unit with width, weight, length and quality grade. The roll passport shows the production order, the batch and the pieces it was cut into; the batch traces on to the shipment and the customer.

Shipments between plants

While yarn travels to a weaving plant in another city, stock shows up in two places or nowhere; waybills are written by hand.

With Hadron

Two-step transfer: goods in transit show as “in transit” at the receiving plant but are never promised to customers. E-waybills are generated for shipments between your own sites too, and loaded rolls are scanned by barcode.

Dyehouse cost doesn’t reach the product

The cost of fabric sent to a subcontractor stays in an expense account; the product looks cheaper than it is and pricing goes wrong.

With Hadron

The subcontracted step in the routing opens a purchase order; the cost flows to the production order at goods receipt. The scrap rate is reported from sent and returned quantities.

How much of the order is ready?

When the same product is made for several customers, nobody knows how much of each order has been produced.

With Hadron

In make-to-order, each production order is linked to its sales order: the order screen shows quantities produced, in production and planned. Your customer can follow along on the Hadron Partner portal too, if you choose.

Value chain

From yarn to customer, on one record

Each stage inherits the batch and cost of the one before.

  1. 01

    Yarn

    Yarn enters stock with lot and batch numbers.

  2. 02

    Weaving and knitting

    Yarn batches are consumed; each roll is barcoded with its measurements.

  3. 03

    Dyeing and finishing

    In your own dyehouse or subcontracted; scrap and cost are written to the order.

  4. 04

    Cutting and sewing

    Rolls are cut, pieces stay linked to their source roll; size-colour variants are produced.

  5. 05

    Shipment

    Every carton and batch is recorded; e-invoice and e-waybill documents are generated.

FAQ

What textile companies ask

The most frequent questions before a demo.

No. Variants inherit the parent product’s bill of materials and routing. You define a separate bill only for a variant that needs a different recipe (for example a different dye recipe per colour).

Scan the roll’s barcode: the roll passport shows which production order and batch it came from and, if it was cut, which pieces it was split into. Through the batch you can also trace which shipment took it to which customer.

The subcontracting scrap report shows the sent and returned quantity and the scrap rate for each subcontract order. The subcontracting cost is also written to the production order at goods receipt.

Each plant sees its own stock. In an inter-plant transfer, once the goods leave they show as “in transit” at the receiving plant but are not available for sales or planning; on arrival they move to free stock. An e-waybill is generated for shipments between your own sites too.

Yes. Every roll has a quality grade, shown on its roll passport. A quality requirement can be set on an inter-plant transfer plan; the shop floor cannot load a roll that does not meet it.

No. Hadron generates e-invoices and e-waybills in the UBL-TR format and is connected to the integrator you use today during go-live. Your integrator contract and taxpayer settings stay as they are.

See Hadron with
your own data

In a 30-minute demo, we set up your processes on Hadron together.