
The quality decision, at the gate of stock
Inspection records, usage decisions and quality grades from goods receipt to production confirmation; the decision’s stock and cost impact is posted in the same transaction.
Inspection record list: material, quantity, triggering transaction and status
From receipt to shipment, quality on record
The tools your quality team uses every day, on one screen.
Inspection record detail: summary of a decision with accept, reject and scrap
Inspection records
For materials under quality control, an inspection record opens automatically at goods receipt, production order confirmation and process order completion.
Quality stock
Goods under inspection wait in quality stock and don’t show as available.
Usage decisions
Accept, reject or partial: released, blocked and scrap quantities are split; scrap cost is posted in the same transaction.
Process parameters
Targets and limits for phase parameters; out-of-range results are flagged without stopping production.
Supplier quality scores
Monthly accept, reject and scrap rates per supplier and material from goods receipt decisions.
Quality grades: code, rank and sellability
Quality grades
A, B, C and non-sellable grades on the unit or batch, with change history. Goods of a non-sellable grade can’t be shipped.
Five steps from receipt to shipment
The quality decision reaches stock, cost and shipping at the same moment.
Goods receipt
Materials under quality control go to quality stock.
- The inspection record opens with the batch
- Goods don’t show as available stock
- An open inspection holds invoice verification
Inspection records opened from goods receipt
Usage decision
The inspection result reaches stock with a single decision.
- Accept to released stock, reject to blocked stock
- Partial decisions split accept, reject and scrap
- A rejected batch becomes blocked
Usage decision form: accept, reject and scrap quantity
Quality in production
Confirmations and process phases create quality records.
- The quantity produced waits in quality stock
- Out-of-limit phase parameters are flagged
- An open inspection holds the production order close
Process order phases: parameter ranges and out-of-range flag
Grades and shipping
The quality grade is the gate for shipping and transfers.
- Grade on the unit or batch, with history
- Non-sellable grades can’t be shipped
- A transfer plan can require a specific grade
Quality grade and change history on a unit
Supplier evaluation
Decisions feed the supplier score.
- Monthly, per supplier and material
- Accept, reject and scrap rates
- Batch status: released, restricted or blocked
Supplier quality scores
Every quality decision writes to the other modules at once
No interim transfers, no overnight integrations, no month-end reconciliation.
- Procurement & InventoryGoods receipt goes to quality stock; an open inspection holds the invoice.
- Production PlanningProduction confirmation opens an inspection record; an open inspection holds the order close.
- Sales & DistributionBatches of non-sellable quality can’t be shipped.
- Finance & AccountingScrap decisions are posted to accounting in the same transaction.
- Warehouse ManagementRejected goods become blocked stock in the storage bin.

About quality management
The most common questions before going live.
For materials under quality control, an inspection record opens automatically at goods receipt, at production order confirmation and when a process order completes. A record is also created on shipment; it opens after goods issue and is not a pre-shipment check.
Not for materials under quality control. The incoming quantity waits in quality stock and doesn’t show as available. A usage decision releases, blocks or scraps it.
The quantity scrapped in a usage decision leaves stock and its cost is posted to accounting in the same transaction. For inspections from production, scrap cost is added to the production order’s actual cost.
Monthly accept, reject and scrap rates per supplier and material are calculated from goods receipt inspection decisions. Delivery time and price are not part of this score.
The grade is kept on the unit or batch and every change is recorded with who, when and why. Goods of a non-sellable grade can’t be shipped; a stock transfer plan can require a specific grade.
Not yet. Today inspection works at quantity and decision level. Characteristic-level measurements, specification limits, statistical process control and certificates of analysis are on our roadmap.

See Hadron with
your own data
In a 30-minute demo, we set up your processes on Hadron together.